Connect with us

Hi, what are you looking for?

Economy

Silver North Provides Tim Drilling Progress Update

(TheNewswire)

Drilling indicates the presence of a Carbonate Replacement (‘CRD’) style system at Tim

Program Expanded to include airborne geophysical surveys

Over 1,300 m of planned 2,000 m of drilling completed to date

Management recently completed site visit

Vancouver, BC, August 19, 2 024 – TheNewswire – Silver North Resources Ltd. (TSX-V: SNAG, OTCQB: TARSF) Silver North ‘ or the ‘ Company ‘) is pleased to provide an update on 2024 Yukon exploration activities at the Tim silver property. The Tim Property is under option to, and operated by, Coeur Mining, Inc. (‘Coeur’ NYSE-CDE), which is funding the 2024 program. To date, over 1,300 metres of drilling in four holes have been completed.

‘We are extremely pleased with Coeur’s progress to date at Tim,’ stated Rob Duncan, VP Exploration for Silver North after a recent site visit to the Tim Property. ‘Given that the Wolf Fault has been identified in several historic trenches, in the current drillholes and anomalous soil geochemistry over a cumulative strike length of >2 km, we believe that the Tim project displays the necessary characteristics of a potentially productive CRD system. We are eagerly awaiting the analytical results from this program, which are expected to be received in October.’

Diamond drilling at the Tim Property commenced at the end of June, testing the potential for stratiform (manto) and structural (chimney) style Carbonate Replacement Deposit (‘CRD’) mineralization. Drilling at Tim is primarily targeting the Wolf Fault, a northwest striking and steeply southwest dipping structure that parallels the regionally significant Kechika Fault, which can be traced from the Silvertip land package through Tim and Silver North’s Veronica Project (recently acquired via option). Large conductivity anomalies defined by SkyTEM airborne geophysical data are associated with the Wolf Fault, as is silver mineralization and/or heavily oxidized fault breccias in historical trenches.

All 4 holes drilled to date have intersected the strongly oxidized Wolf structure and/or parallel splays of it. The Wolf Fault is noted to emplace overlying Kechika phyllite and argillites in fault contact with the underlying prospective Rosella Limestone Formation. At depth, parallel structures to the Wolf Fault are seen within the argillites of the Boya Formation that underlie the Rosella limestones. Geological and structural features that have been observed in the drilling to date consist of diagnostic features that are commonly associated with significant CRD mineralization and have been observed at the Silvertip deposits. Such characteristics include fugitive calcite veining that fluoresces in UV light (displaying the classic ‘barbeque’ pink and orange fluorescence) and re-crystallization of the host limestones. These features suggest that the Wolf Fault target at Tim could be part of a productive CRD system.

Click Image To View Full Size

Coeur has indicated it is planning to complete six holes for a total drilled meterage of approximately 2,200 m. In addition to the drilling, Coeur will also be undertaking two additional detailed airborne geophysical surveys over the entire project consisting of magnetics and radiometrics surveys and a Mobile MT survey that has the potential to detect conductive features at much greater depths than the recent SkyTEM airborne survey of the property. These elements represent an expansion of the planned 2024 exploration program. The current program is expected to wrap up by early September.

The 2024 program is conducted under the direction of Coeur’s exploration team based at Silvertip, under the terms of an option agreement granting Coeur the right to earn a 51% interest in the property by completing a minimum of $3.15 million in additional exploration expenditures and making additional cash payments to Silver North totalling $275,000 by December 31, 2026. Coeur can bring its interest to 80% by making additional cash payments of $100,000 per year in 2027 and 2028, completing a positive feasibility study and informing Silver North of its intention to develop a mine at Tim by December 16, 2028. Under this agreement, Coeur must fund a minimum $700,000 program in 2024. Tim is road accessible via 25 km of 4 x 4 access off the Silvertip Mine Road.

About Silver North Resources Ltd.

Silver North’s primary assets are its 100% owned Haldane silver project (next to Hecla Mining Inc.’s Keno Hill Mine project) and the Tim silver project (under option to Coeur Mining, Inc.).

The Company is listed on the TSX Venture Exchange under the symbol ‘SNAG’, trades on the OTCQB market in the United States under the symbol ‘TARSF’, and under the symbol ‘I90’ on the Frankfurt Stock Exchange.

Mr. Jason Weber, P. Geo., President and CEO of Silver North Resources Ltd. is a Qualified Person as defined by National Instrument 43-101. Mr. Weber supervised the preparation of the technical information contained in this release.

For further information, contact:

Jason Weber, President and CEO

Sandrine Lam, Shareholder Communications

Tel: (604) 807-7217

Fax: (888) 889-4874

To learn more visit: www.silvernorthres.com

X: https://x.com/SilverNorthRes

LinkedIn: https://

Copyright (c) 2024 TheNewswire – All rights reserved.

News Provided by TheNewsWire via QuoteMedia

This post appeared first on investingnews.com
Enter Your Information Below To Receive Free Trading Ideas, Latest News And Articles.

    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

    You May Also Like

    Editor's Pick

    On April 23, 1985, the Coca-Cola Company made one of the biggest mistakes in American business history: it changed the formula for Coca-Cola. Outraged...

    Editor's Pick

    For years the North Korean playbook was obvious to the world. The Democratic People’s Republic of Korea wanted to be the center of attention....

    Editor's Pick

    The final December results from the University of Michigan Surveys of Consumers show overall consumer sentiment improved for the month but remains near historically...

    Editor's Pick

    New orders for durable goods fell 2.1 percent in November, following a 0.7 percent gain in October. Total durable-goods orders are up 10.6 percent...